![](https://d3gqasl9vmjfd8.cloudfront.net/70aa4645-9974-4a91-8f18-4e4a9cf96e93.jpg)
![](https://d3gqasl9vmjfd8.cloudfront.net/e1849738-0e80-4445-a1ca-a4da6c347ab4.jpg)
![](https://d3gqasl9vmjfd8.cloudfront.net/4a17831a-2ccd-45c0-a828-c6b9ac407e77.jpg)
![](https://d3gqasl9vmjfd8.cloudfront.net/2c64aa88-132a-4928-84f8-bfb53cecb41b.jpg)
![](https://d3gqasl9vmjfd8.cloudfront.net/3c0aa521-8d07-4778-bec2-e59ad93ba0e1.png)
![](https://d3gqasl9vmjfd8.cloudfront.net/a3c72666-1ea7-48fb-bb6c-19ffb9b360ea.png)
![](https://d3gqasl9vmjfd8.cloudfront.net/febc01cd-599e-4c03-8e72-5f4d7941a0c4.png)
![](https://d3gqasl9vmjfd8.cloudfront.net/c363d2e9-5d37-45ae-818a-5a19a48980da.png)
Features
- For all concrete or wood surfaces
- Acrylic-epoxy technology
- True 1-coat hot tire resistant coating
- Paint and primer in 1
- No more than 1 coat needed
- 1 gallon is enough for a standard 2-car garage
- Light chemical resistant
- Covers up to 500 square feet
Shipping Note: Shipping to Alaska, Hawaii, APO addresses, or PO Boxes is not available for this item.
Warranty: 90 Day Woot Limited Warranty
Specs
Specifications | |
---|---|
Sheen: | Satin 15-25 (at 85°) |
Dry to touch: | Within 4 hours* |
Dry to park: | After 7 days* |
Coverage: | 350 - 500 sq. ft. |
Tools clean up: | Soapy water |
Country of origin: | Canada |
Double drying times if humidity level is above 60% or if temperature is below 60°F
In the box:
(1) Gallon of Craftsman Indoor/Outdoor Garage Floor Coating
Specs
Specifications | |
---|---|
Sheen: | Satin 15-25 (at 85°) |
Dry to touch: | Within 4 hours* |
Dry to park: | After 7 days* |
Coverage: | 350 - 500 sq. ft. |
Tools clean up: | Soapy water |
Country of origin: | Canada |
Double drying times if humidity level is above 60% or if temperature is below 60°F
In the box:
(1) Gallon of Craftsman Indoor/Outdoor Garage Floor Coating
Sales Stats
- Speed to First Woot:
- 17h 39m 54.445s
Purchaser Experience
Purchaser Seniority
Quantity Breakdown
Percentage of Sales Per Hour
12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
---|
Percentage of Sales Per Day
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|