Features
The Porter-Cable corded oscillating multi-tool kit includes a 3.0 Amp motor for power and durability on the jobsite. This model delivers the performance needed for tough applications, including cutting, sanding, scraping, and grinding. It delivers up to 10,000-22,000 oscillations per minute so users can quickly complete different applications in a variety of materials.
- 3 Amp Motor delivers power to complete applications fast
- Tool free system blade change allows quick changes and adjustments for specific applications without wrenches and bolts
- Depth and Cutting Guide helps complete plunge and cutting tasks faster and with more control
- Variable Speed Dial (10,000 – 22,000 OPM) optimizes performance and control across a complete range of applications
- 3 Position Over Mold provides gripping area on the front, middle and rear to improve comfort by reducing vibration
- 10 Foot Cord minimizes the need for extension cords
Shipping Note: Shipping to Alaska or Hawaii is not available for this item.
Warranty: 3 Year Limited Manufacturer Warranty
Specs
Specifications | |
---|---|
Amps: | 3.0A |
Oscillating Angle: | 2.8° |
Power Type: | Corded (10' Cord) |
Oscillations Per Minute: | 10,000-22,000 |
In the box:
- PCE605 3 Amp Multi-Tool
- (1) Depth/Cutting Guide
- (1) Precision Wood End-Cut Blade
- (1) Wood/Metal End-Cut Blade
- (1) Flush Cut Blade
- (1) Sanding Platen
- (25) Sandpaper Sheets
- (1) Flexible Scraper
- (1) Kit Box
Specs
Specifications | |
---|---|
Amps: | 3.0A |
Oscillating Angle: | 2.8° |
Power Type: | Corded (10' Cord) |
Oscillations Per Minute: | 10,000-22,000 |
In the box:
- PCE605 3 Amp Multi-Tool
- (1) Depth/Cutting Guide
- (1) Precision Wood End-Cut Blade
- (1) Wood/Metal End-Cut Blade
- (1) Flush Cut Blade
- (1) Sanding Platen
- (25) Sandpaper Sheets
- (1) Flexible Scraper
- (1) Kit Box
Sales Stats
- Speed to First Woot:
- 5d 1h 12m 4.555s
Purchaser Experience
Purchaser Seniority
Quantity Breakdown
Percentage of Sales Per Hour
12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
---|
Percentage of Sales Per Day
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|