Features
The ToughBuilt 3-piece Builder Tool Belt Set brings a new level of organization and efficiency to every project. Innovative ClipTech technology gives professionals adjustable and interchangeable pouches to fit every job. Clip pouches onto and off the belt effortlessly to carry what you need, when you need it. This set includes the rugged Contractor Pouch, Modular Hammer Loop and Padded Belt with heavy-duty buckle. An integrated kickstand allows your pouch and tools to stand on the floor or table next to you. 23 pockets and loops – including a speed square pocket, 2 large-capacity,
No-Snag Hidden-Seam Pockets, notebook pocket and extreme-duty hammer loop – meet all the demands of a professional contractor. With rugged 6-Layer construction and heavy-duty rivet reinforcement, this dependable tool belt is engineered to withstand the harshest working conditions.
- ClipTech pouch clips on and off any belt
- Kickstand your pouch and tools on the floor or table next to you
- Fits 32 - 48" waists
- Extreme-duty hammer loop
- Speed square pocket
Warranty: Manufacturer limited-lifetime-warranty
Shipping Note: Shipping to Alaska, Hawaii, and PO Boxes is not available for this item
Specs
In the Box:- (1) ToughBuilt 3-Piece Builder Tool Belt Set - (TB-CT-101-3P)
Size | One Size |
---|---|
Material | Polyester |
Brand | ToughBuilt |
Color | Black |
Number Of Pockets | 23 |
Closure Type | Buckle |
Product Dimensions | 13.78"W x 13.39"H |
Manufacturer | TOUGHBUILT |
Part Number | TB-CT-101-3P |
Item Weight | 3.54 pounds |
Specs
In the Box:- (1) ToughBuilt 3-Piece Builder Tool Belt Set - (TB-CT-101-3P)
Size | One Size |
---|---|
Material | Polyester |
Brand | ToughBuilt |
Color | Black |
Number Of Pockets | 23 |
Closure Type | Buckle |
Product Dimensions | 13.78"W x 13.39"H |
Manufacturer | TOUGHBUILT |
Part Number | TB-CT-101-3P |
Item Weight | 3.54 pounds |
Sales Stats
- Speed to First Woot:
- 6h 5m 58.228s
Purchaser Experience
Purchaser Seniority
Quantity Breakdown
Percentage of Sales Per Hour
12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
---|
Percentage of Sales Per Day
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|