Features
The Yard Tool Rack will hold up to 15 or 20 tools including large tools like weed eaters and wheel barrows. This tool rack makes organizing your garden tools easier than ever.
- Holds up to 200 lbs
- 3" hooks can be placed backward for storing items used less often
- Hooks slide on bar for easy customization
- Bar and hooks made of industrial grade powder coated steel
- Installs in 15 minutes
- Small Rack - 35 inches and holds up to 15 tools
- Large Rack - 51 inches and holds up to 20 tools
Shipping Note: Shipping to Alaska, Hawaii, PO Boxes and APO addresses not available for this item
Warranty:Limited Lifetime Monkey Bar Storage
Specs
Specifications | |
---|---|
Installation: | 15 minutes |
Material: | Steel |
Weight Capacity: | 200 |
Mount Type: | Wall |
Small Length: | 35 inches |
Large Length: | 51 inches |
In the Box:
Small Yard Tool Rack Includes:
- (2) Shed Brackets
- (1) 35" Monkey Bar
- (1) 12" Hook
- (1) 3" Double Hook
- (1) 3" Single Hook
- (1) 3" Wide Hook
- (1) 5" Wide Hooks
- (1) J Hook
- (1) Hardware Bag
Large Yard Tool Rack Includes:
- (2) Shed Brackets
- (1) 51" Monkey Bar
- (1) 12" Hook
- (2) 3" Double Hooks
- (1) 3" Single Hook
- (1) 3" Wide Hook
- (2) 5" Wide Hooks
- (1) J Hook
- (1) Hardware Bag
Specs
Specifications | |
---|---|
Installation: | 15 minutes |
Material: | Steel |
Weight Capacity: | 200 |
Mount Type: | Wall |
Small Length: | 35 inches |
Large Length: | 51 inches |
In the Box:
Small Yard Tool Rack Includes:
- (2) Shed Brackets
- (1) 35" Monkey Bar
- (1) 12" Hook
- (1) 3" Double Hook
- (1) 3" Single Hook
- (1) 3" Wide Hook
- (1) 5" Wide Hooks
- (1) J Hook
- (1) Hardware Bag
Large Yard Tool Rack Includes:
- (2) Shed Brackets
- (1) 51" Monkey Bar
- (1) 12" Hook
- (2) 3" Double Hooks
- (1) 3" Single Hook
- (1) 3" Wide Hook
- (2) 5" Wide Hooks
- (1) J Hook
- (1) Hardware Bag
Sales Stats
- Speed to First Woot:
- 59m 15.227s
Purchaser Experience
Purchaser Seniority
Quantity Breakdown
Percentage of Sales Per Hour
12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
---|
Percentage of Sales Per Day
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
---|